Wednesday, December 18, 2019

Seismic Performance Assessment For Vulnerability Analysis...

State of the Review on Seismic Performance Assessment for vulnerability analysis of RC Buildings Summary Keywords Introduction The paper is intended to present some studies undertaken in order to develop a seismic vulnerability estimation system to fit the needs of development of earthquake scenarios and of development of an integrated disaster risk management system for India. Figure 1: The components of seismic risk assessment and choices for the vulnerability assessment procedure; the bold path shows a traditional assessment method (Calvi et al. 2006). Seismic Hazard Hazard analysis is the process of quantitatively estimating the ground motion at a site or region of interest based on the characteristics of surrounding seismic sources. This study falls primarily within the disciplines of geology and seismology with input from civil engineering (FEMA, 1989). The basic methodology of hazard analysis is comprised of source modeling, wave attenuation, and local ground amplification. Deterministic Probabilistic Probabilistic assessment of seismic hazard involves determining either the probability of exceeding a specified ground motion, or the ground motion that has a specified probability of being exceeded over a particular time period. Elements/Exposure at Risk Vulnerability assessment should be done for a building that represents a building stock. This requires a standard systematic inventory system that classifies the structures according to their type,Show MoreRelatedCissp Study Guide67657 Words   |  271 Pagesthe following are basic components of a security policy EXCEPT the A. definition of the issue and statement of relevant terms. B. statement of roles and responsibilities C. statement of applicability and compliance requirements. D. statement of performance of characteristics and requirements. Answer: D Explanation: Policies are considered the first and highest level of documentation, from which the lower level elements of standards, procedures, and guidelines flow. This order , however, does not meanRead MoreProject Mgmt296381 Words   |  1186 PagesSWAT analysis 6.5.2.7 Schedule compression 9.4.2.5 Leadership skills G.1 Project leadership 10.1 Stakeholder management Chapter 11 Teams Chapter 3 Organization: Structure and Culture 2.4.1 Organization cultures [G.7] 2.4.2 Organization structure [9.1.3] 9.1.1 Organization charts 1.4.4 Project offices Chapter 4 9.2 Building the team (.1.3) [3.5.3] [App G.2 Building teams] 9.4 Managing the team 9.3.2 Team building activities 9.2.4 Virtual teams 9.3.3.1 Team performance [9.4

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.